Network Pricing
Schedules
2026 Pricing Update
As signalled last year , from the 1st of May-2026 we are making several changes to our pricing to better align methodologies and tariff structures with the local network to which the Embedded Networks are connected, simplify our pricing framework, and rationalise the number of pricing categories. The changes made in 2025 allowed optional adoption throughout the prior year as retailers had the capacity and system capability to implement them.
However, these changes are now mandatory from the 1st of May 2026.
Time-of-Use (TOU) pricing categories are now mandatory across most regions where our embedded networks operate, provided the local network offers a TOU option.
As part of this transition, the NHH uncontrolled, controlled, and all-inclusive tariffs have been consolidated into the single TOU plan, provided the appropriate meter channels are in place. This allows retailers to submit data where meters are not communicating, or where they do not yet have the capability to report TOU tariffs within EIEP1 submissions.
Our methodologies and time periods align with those of the local networks we operate within. This approach supports the networks' objectives, including managing constraints and directing investment through their pricing signals.
Last year we included a distributed generation tariff, and in 2026 we have updated this to also add distributed generation tariffs for peak and off peak periods in line with those implemented by the local networks. While we have considered whether these tariffs are necessary for multi-tenanted properties—where solar installations are less likely—we recognise that rapid technological advancements may lead consumers to adopt batteries or other alternative export methods in the future.
Pricing Guide
For details on pricing, time-of-use periods, and the charging methodology, please refer to our pricing guide.
2026 Price Schedules
CBRE - Pricing and loss factors 1 May 2026
EDCL - Pricing and loss factors 1 May 2026
ENSL - Pricing and loss factors 1 May 2026
KIPT - Pricing and loss factors 1 May 2026
NZAL - Pricing and loss factors 1 May 2026
PPNZ - Pricing and loss factors 1 May 2026
PSPI - Pricing and loss factors 1 May 2026
RJEN - Pricing and loss factors 1 May 2026
2025 Price Schedules
AIAL EN Line Network Tariff Rates effective 1 Nov 2025 to 1 Nov 2026
CBRE - Pricing and loss factors 1 May 2025
EDCL - Pricing and loss factors 1 May 2025
ENSL - Pricing and loss factors 1 May 2025
KIPT - Pricing and loss factors 1 May 2025
NZAL - Pricing and loss factors 1 May 2025
PPNZ - Pricing and loss factors 1 May 2025
PSPI - Pricing and loss factors 1 May 2025
RJEN - Pricing and loss factors 1 May 2025
Pricing schedules will be periodically updated throughout the pricing year, to accommodate the expansion of embedded networks into regions where pricing and loss factors were not previously configured. To enhance transparency and support change tracking, version control will be implemented within the documents starting 1 May 2025.
If a pricing schedule for a specific participant code is no longer available in the current pricing year, it means the embedded network participant code has been closed, and the embedded networks under that code have been transferred or disbanded.
Click here for historical pricing schedules